Nam Theun 2 Hydroelectric Project

Construction of a roller compacted concrete (RCC) main dam of the height of 39 m and the crest length of 325 m plus 13 earthwork saddle dams and an RCC regulating dam, a 5-km long headrace channel, plus a 3-km long underground waterway comprising headrace tunnel , pressure shaft, and pressure tunnel, a 27-km long downstream channel including a 682-metre long tunnel, the civil work of a power station housing six generating units of a total installed capacity of 1,080 MW, roadworks of more than 100 km in length, operators’ village, etc


Started Project


End of Project