Friendship Bridge III (Nakhon Phanom - Khammouan)

Construction of a 2 lanes reinforced concrete bridge having a center span length of 180 metres, road surface width of 9.50 metres and 2 sidewalks width of 1.05 metres with a total length of 1,423 metres and the construction of the asphaltic concrete road, concrete road, the boarder station of Thai and Lao PDR, landscape architectural work including toll station, lighting system, label, traffic sign and drainage system.

2009

Started Project

2011

End of Project