North Bangkok Power Plant Gas Pipeline

Construction of natural gas pipeline with a diameter of 24 inch 15.9 mm wall thickness, 3LPE tri-laminate coated and internally epoxy coated. Almost entire 7 km of pipeline was constructed by HDD (Horizontal Directional Drilling) method. Fibre Optic Cable along with its Duct installed along the pipeline. Construction of Block Valve Station equipped with SCADA monitoring facilities installed in SCADA room of Control Building. Construction of Venting and Blow-down Stack was part of this system. Pig Launching station installed near control room.

2008

Started Project

2009

End of Project