Sarasin Bridge 2

Construction of a 2 lanes concrete box segment bridge having a center span length of 100 m with a total length of 655.05 m, including approach structure, u-turn road, pedestrian bridge, lighting system, label, traffic sign and drainage system.

2009

Started Project

2011

End of Project