Rupsa Bridge Construction Project, Khulna Bangladesh

Construction of bypass in Khulna City with the length of 10 km. with the asphaltic concrete pavement including Rupsa crossing bridge with the length of 1,360 m. and 2 small bridges with the length of 90 m. and 30 m. The main bridge over the river is designed as a cast-in-place concrete box girder built by the balance cantilever method. The main bridge consists of 5 central span 100 m. each with side span 70 m. each, totally 1,360 m.
2001

Started Project

2005

End of Project